Well, Mom and Dad made it back safely. Our time since the last post has pretty much been consumed by building the barn. We are now ready to put the roof trusses on. They are scheduled to arrive next Friday, and the folks who built them will bring a crane out to set them. They are 56 feet long and nearly 10 feet tall, so it is no small undertaking.

I'm thankful that we were able to build the larger section using materials from an old grain bin here and the pole barn we tore down. For the smaller section I did buy some new materials, but we should be able to put the roof girts and remaining wall girts (boards that get nailed on to the studs and trusses for use in fastening the tin on) without buying any more new boards.

This is how I felt when we got the larger section completed:




Here is what the completed wall structure looks like:





The whole thing measures 48 feet by 56 feet, because those were the dimensions of the existing foundation. Not having to put in a foundation and just doing a few repairs on the old one helped tremendously in keeping the cost down.

Last Sunday we had an unexpected pleasant surprise when Paul Ostrowski, a good friend from my Navy days (as though I'm so far removed from them:-), called to say he was stopping through Minot to drop off some Air Force folks and get some gas. They were only going to be on deck for 45 minutes, so Trev and I hopped in the car and drove in to see him. Ir was great to catch up and sit in old trusty C-9 again.


This coming week is full, with final prep for the trusses, a trip to Fargo, ND for medical appointments related to my VA disability claim, and then back home late Thursday night to be ready to set trusses Friday morning.

That's it for now!

1 comment:

  1. So tell us how you felt being back in that plane again. Do you miss flying?

    I'm so excited about the progress on the barn! Way to go!! I pray all goes well to the end of the project.

    Love you guys!

    ReplyDelete